Quantcast INSPECTION - TM-1-1730-231-13P_56

Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: INSPECTION
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
PRESSURE GAGE
Up
TM-1-1730-231-13P Hydraulic Kneeling/Erecting Cart P/N: 10064-10 Manual
Next
RELIEF VALVE - TM-1-1730-231-13P_57
TM 1-1730-231-13&P 3-18.  PRESSURE GAGE - Continued 3-18 A. INSPECTION 1. Check pressure gage (1) for physical damage. 2. Check gage for accuracy at regular Intervals by removing it and comparing against a standard gage. B. REMOVAL 1. Disconnect inlet tube at filter inlet, next to the pressure gage (1). 2. Unscrew pressure gage (1) from manifold (2). C. CALIBRATION (USATSG) Calibration will be performed by the U.S.  Army, Test, Measurement and Diagnostic Equipment, Support Group in accordance with the standard practice. D. INSTALLATION 1. Screw pressure gage (1) in manifold (2) and turn till the gage can be properly seen when tightened. 2. Reconnect inlet tube at filter inlet, next to the pressure gage (1). END OF TASK 3-19

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc.