Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Power Shutdown
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 1-4920-448-13&P 2-11. Power Shutdown. HIGH VOLTAGE exists in the electrical system of the shop. All electrical  inspections,  repairs  or  replacement  will  be  performed  with the  power  off  and  only  by  qualified  electricians.  Serious  shock  hazards exist  which  could  result  in  injury  or  death  to  personnel. a. Power Off at Shelter. 1. Ensure all electrical tools and shop equip- ment  are  turned  off. 2. Set main and individual circuit breakers in circuit  breaker  panel  to  OFF  position. . b.Power Off at Power Distrubution Panel. .     .     . Set corresponding shelter power cable circuit breaker (1) in  power  distribution  panel  (2)  to  OFF  position. 2-28

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business