Quantcast INSTALLATION - MAIN PUMP

 

Click here to make tpub.com your Home Page

Page Title: INSTALLATION - MAIN PUMP
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
REMOVAL - FILL PUMP
Up
TM-55-4920-442-13-P Aircraft Hydraulic System Test Stand Trailer Mounted Type MK-1 Manual
Next
Cooler - Inspect
TM 55-4920-442-13 & P
3-64. Pumps-Replace (cont.)
3-64
INSTALLATION - MAIN PUMP
1. Lift pump into place through bottom of test stand using sling of overhead lifting device.
2. Attach main pump to motor with twelve mounting bolts and washers.
3. Connect volume and compensator controls to the pump.
4. Connect all tubing and lines to and from the pump.
INSTALLATION - FILL PUMP
1. Connect fill pump to motor with mounting bolts.
2. Connect two lines to fill pump.
END OF TASK
3-90

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc.
6230 Stone Rd, Unit Q Port Richey, FL 34668

Phone For Parts Inquiries: (727) 493-0744
Google +