Quantcast INSTALLATION - LOW PRESSURE GAGE

 

Click here to make tpub.com your Home Page

Page Title: INSTALLATION - LOW PRESSURE GAGE
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
REMOVAL - HIGH PRESSURE GAGE
Up
TM-55-4920-442-13-P Aircraft Hydraulic System Test Stand Trailer Mounted Type MK-1 Manual
Next
DISASSEMBLY - FLOWMETER
TM 55-4920-442-13 & P
3-94.
Instruments - Replace (cont)
3-94
INSTALLATION - LOW PRESSURE GAGE
1. Install gage through front of panel and attach with three mounting screws.
2. Connect gage at test port tee on back of panel.
3. Install gage cover and tighten thumb screw.
INSTALLATION HIGH PRESSURE GAGE
1. Install gage through front of panel and attach with three screws and washers.
2. Connect flexible hoses to gage in back of panel.
3. Install cover and tighten thumb screw.
INSTALLATION FILL PRESSURE GAGE
1. Install gage through front of panel and attach with three screws and washers.
2. Connect flexible hoses to gages in back of panel.
INSTALLATION OIL TEMPERATURE GAGE
1. Install gage through front of panel and attach with three screws and washers.
2. Route line from the oil temperature gage over the cooler fan shroud to the low pressure filter manifold (under the
low pressure filter). Fasten line in place with cable clamps.
GO TO NEXT PAGE
3-145

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc.