Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Pre-operation Relief Valve Setting Check
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 1-1730-231-13&P 4. Remove controller from cabinet and ensure pump switch S4 (10, Figure 2-1) is in OFF position. 5. Connect  MS3506-1  power  receptacle  from  cart  to  aircraft  24  vdc  supply  or  to  power  plug  on  alternate  24  vdc source. 6. Ensure POWER ON indicating light (9) is on. 7. Open hydraulic fluid filler cap on reservoir. Remove bleed adapter (3) from it. 8. Install bleed adapter (3) into the left hydraulic hose strut connector. 9. Point and hold connector with bleed adapter (3) installed Into the filler cavity. 10.    Ensure left manual flow regulator (6) is in open position (turn counterclockwise). 11.    Set pump switch S4 (10) to ON. Move left switch S1 (12) to RAISE and hold. Observe for fluid flow. When fluid flows without air bubbles, release S1. Set pump switch S4 to OFF. Remove bleed adapter (3) from hose. 12.    Install bleed adapter (3) into the right hydraulic hose strut connector. 13.    Point and hold connector with bleed adapter installed into the filler cavity. 14.    Ensure right manual flow regulator (7) is in open position (turn counterclockwise). 15.    Set pump switch S4 (10) to ON. Move right switch S2 (13) to RAISE and hold. Observe for fluid flow. When fluid flows without air bubbles, release S2. Set pump Switch S4 to OFF. Remove bleed adapter (3) from hose. 16.    After air is removed from hydraulic hose(s). Store bleed adapter in filler cap of reservoir and install hydraulic fluid filler cap. 17.    Replenish the hydraulic oil reservoir as necessary using MIL-H-5606. 18.    The system is now ready to connect to the helicopter. 2-7. Pre-operation Relief Valve Setting Check. Prior to putting the cart into operation, relief valve setting should be observed and adjusted, if necessary. To perform, proceed as follows: 1. Remove grounding cable from cart and connect as required. 2-7