| |
TM 1-1730-231-13&P
3-17. GEAR PUMP
3-17
This task covers:
A. INSPECTION
B. REMOVAL
C. INSTALLATION
INITIAL SETUP
Tools
Tool Kit, Hydraulic, NSN 5180-00-323-4891
Personnel Required
MOS 68H
General Safety Instructions
WARNING
Be sure that all electrical power is removed from the unit before
beginning any maintenance operation.
NOTE
Tag all disconnected wiring and tubes to ease reinstallation. Ensure that
hydraulic fluid is drained from the reservoir.
GO TO NEXT PAGE
3-15
|