| |
TM 1-1730-231-13&P
3-18. PRESSURE GAGE
3-18
This task covers:
A. INSPECTION
B. REMOVAL
C. CALIBRATION
D. INSTALLATION
INITIAL SETUP
Tools
Tool Kit, Instruments, NSN 5180-00-323-4913
Personnel Required
MOS 67 and MOS 68X
General Safety Instructions
WARNING
Be sure that all electrical power is removed from the unit before
beginning any maintenance operation.
To avoid personnel injury, the pump must be shut down before
beginning any maintenance operation.
GO TO NEXT PAGE
3-18
|