| |
TM 1-4920-446-13 & P
3-69. Fluid reservoir - Inspect
3-69
This task covers: Inspection
INITIAL SETUP
Personnel Required:
MOS 67-series
INSPECTION
1.
Check fluid level to make sure it is at least 3/4 full.
2.
Check all tubing and line connections for leaks.
3.
Check sending unit wire for loose connection or corrosion.
4.
Check reservoir tank for physical damage.
END OF TASK
3-87
|