3-86. Panel assembly - Replace (Contd)
3-86
Installation:
1.
Use two people, position panel assembly into test stand and fasten with twelve mounting bolts.
2.
Install volume control handle.
3.
Connect all fluid lines, tubing, and flexible hoses to the back of the panel.
4.
Connect all electrical wiring to the back of the instruments and secure wires to the chassis using routing clamps.
5.
Connect temperature gauge line to the low pressure manifold and secure line to the chassis using routing clamps.
6.
Observe test stand during normal operation to verify proper operation of the gauges and instruments and that there
are no hydraulic leaks.
END OF TASK