TM 1-4920-446-13 & P
3-88. Instruments - Replace
3-88
This task covers: Removal and installation
INITIAL SETUP
Tools:
Tool Kit, Instrument, NSN 5180-00-323-4913
Shop Set, AVIM, Electrical-Instrument, NSN 4920-00-165-1453
Personnel Required:
MOS 68
Equipment Condition:
Para. 3-18 Cabinet assembly removed
Test stand shut down and pressure relieved
NOTE
Tag all disconnected wiring to ease reinstallation.
Removal: Fluid temperature gauge (4)
1.
Disconnect line at the low pressure filter manifold (under the low pressure filter), then remove all routing clamps.
2.
Remove mounting hardware and pull gauge out through front of panel.
Removal: Fuel gauge (5)
1.
Disconnect wires at back of gauge.
2.
Remove mounting hardware and pull gauge out through front of panel.
Removal: Hourmeter (1)
1.
Disconnect wiring at back of meter.
2.
Remove mounting hardware and pull out through front of panel.
Removal: Flow indicator (17)
1.
Remove wire at back of indicator.
2.
Remove mounting hardware and pull out through front of panel.
GO TO NEXT PAGE
3-114
|