| |
TM 1-4920-446-13 & P
3-90. Frame assembly
3-90
This task covers: Inspection
INITIAL SETUP
Personnel Required:
MOS 67
Equipment Condition:
Para. 3-18 Cabinet assembly removed
Test stand shut down and pressure relieved.
INSPECTION
1.
Inspect frame assembly for cleanliness, missing paint, and labels.
2.
Inspect frame assembly for dents, corrosion, rust, and broken welds.
3.
Inspect tiedowns and cabinet hardware for presence, cleanliness and material condition.
4.
Inspect hydraulic couplings for damage, cleanliness, corrosion, and presence of dust caps.
5.
Report any discrepancies.
END OF TASK
3-120
|