3-25. MANIFOLD - Continued
3-25
3.
Disconnect four tubes connecting at the bottom of manifold.
4.
Remove four nuts and lockwashers holding the manifold at the bottom.
5.
Lift off manifold assembly, from the cart cabinet. Unscrew four standoffs from manifold.
6.
Remove five hollow plugs and four straight adapters from manifold.
C.
INSTALLATION (AVIM)
1.
Install four straight adapters and five hollow plugs in manifold.
2.
Install components in manifold in accordance with paragraphs 3-18 through 3-24.
3.
Screw standoffs in manifold.
4.
Secure manifold to cabinet with four nuts and lockwashers. Do not tighten fully.
5.
Connect four tubes at the bottom of manifold. (See Figure 6 in Appendix C for location.)
6.
Fully tighten tubes and manifold mounting nuts.
7.
Place solenoid coils on solenoid valves and secure with attaching hardware.
8.
If removed, reconnect solenoid coil wire lugs in junction box.
END OF TASK
3-31
|