| |
TM 1-1730-231-13&P
3-28. FLUID LEVEL SIGHT GLASS
3-28
This task covers:
A. INSPECTION
B. REMOVAL
C. INSTALLATION
INITIAL SETUP
Tools
Tool Kit, Hydraulic, NSN 5180-00-323-4891
Personnel Required
MOS 67
General Safety Instructions
WARNING
Be sure that all electrical power is removed from
the unit before beginning any maintenance
operation.
To avoid personnel injury, the pump must be
shut down before beginning any maintenance
operation.
GO TO NEXT PAGE
3-37
|