| |
TM 1-1730-231-13&P
3-30. RESERVOIR TANK
3-30
This task covers:
A. INSPECTION
B. REPAIR (AVIM)
C. REMOVAL
D. INSTALLATION
INITIAL SETUP
Tools
Tool Kit, Hydraulic, NSN 5180-00-323-4891
Shop Set, AVIM, Hydraulic, NSN 4920-00-165-1454
Parts Required
Gasket, P/N 20079-03
Personnel Required
MOS 67
General Safety Instructions
WARNING
Be sure that all electrical power is removed from
the unit before beginning any maintenance
operation.
To avoid personnel injury, the pump must be
shut down before beginning any maintenance
operation.
NOTE
Tag
all
disconnected
tubing
to
ease
reinstallation.
A.
INSPECTION
1.
Check fluid level to make sure it is to the center of the OPNL LEVEL sight glass (1).
2.
Check all tubing and line connections for leaks.
3.
Check reservoir tank (2) for physical damage.
GO TO NEXT PAGE
3-42
|