Click here to make tpub.com your Home Page

Page Title: Source Code.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 55-4920-405-13&P
How you get an item
3d position
4th position
Who determined
disposition
Who can install,
Who can do
action on an
complete repair-
replace or use
unserviceable
the item
on the item
item
*Complete Repair: Maintenance capacity, capability, and authority to perform all corrective mainte-
nance tasks of-the "Repair" function in a use/user environment in order to restore serviceability to a fail-
ed item.
(1) Source Code. The source code tells you how to get an item needed for maintenance, repair, or
overhaul of an end item/equipment. Explanations of source codes follows:
Code
Explantion
PA
PB
PC**
Stocked items; use the applicable NSN to request/requisition items with these
PD
source codes. They are authorized to the category indicated by the code entered
PE
in the 3d position of the SMR code.
PF
PG
**NOTE: Items coded PC are subject to deterioration.
KD
Items with these codes are not to be requested/requisitioned individually. They
KF
are part of a kit which is authorized to the maintenance category indicated in the
KB
3d position of the SMR code. The complete kit must be requisitioned and applied.
Explanation
Code
MO - (Made at org/  1
I
AVUM Level)
Items with these codes are not to be requested/requisitioned individual-
ly. They must be made from bulk material which is identified by the part
MF - (Made at DS/
--
AVUM Level)
number in the DESCRIPTION AND USABLE ON CODE (UOC) column
and listed in the Bulk Material group of the repair parts list in this
MH - (Made at GS
RPSTL. If the item is authorized to you by the 3d position code of the
Level)
SMRcode, but the source code indicates it is made at a higher level, order
ML- (Made at Spe-
the item from the higher level of maintenance.
cialized Repair
Act (SRA))
MD- (Made at Depot)
Change 3
C-2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business