Click here to make tpub.com your Home Page

Page Title: Table 3-1. Periodic Inspections Chart (cont.)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 55-4920-442-13 & P
Table 3-1. Periodic Inspections Chart (cont.)
Component
Periodic
100 Hour
250 Hour
Hydraulic
Check fluid level
Check for leaks
Drain reservoir.
Reservoir
(3/4 to 7/8 full)
Remove cleanout
covers, clean and
inspect interior,
level indicator
float. (See Figure
C-2, Item 21,
Figure C-9, Item 44.)
Hydraulic Cooler
With power off,
Clean core free
Inspect for damaged
and Fan Assembly
turn fan to check
of dirt accumu-
cored sections.
for freedom of
lation
Tighten connec-
movement and
tions and mounting.
secure mounting.
Check for leaks.
Check for
Check that fan
leakage. Re-
and hub are
place faulty
secured to shaft.
components.
Shaft to be
flush with, or
protrude slightly
Item 72 and 73.)
from fan hub.
Hydraulic Fill
Check bleed valve,
Check for leaks
and Bleed
sight tubes,
and tighten
System
relief valves,
connections if
fill valves,
necessary.
and filters.
Instrument Panel,
Check security of
Check all hose,
Replace panel and
Control and
mounting and
tubing and
all damaged instru-
Knobs
freedom of
connections to
ments, controls,
movement. Clean
gages and valves
and knobs. (See
and inspect
Tighten connec-
cover glass.
tions if
necessary.
Hydraulic
Check for clean-
Check for wear,
External Hose
liness, dust
cuts and abrasions.
capped and
properly stored.
Check for burring
and damaged thread-
ing to couplings;
replace if
necessary. (See
3-5

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business