|
|
TM 55-4920-442-13 & P
3-55. Switches, circuit breakers and lights-Replace
3-55
This task covers:
Removal and Installation
INITIAL SETUP
Tools:
Tool Kit, Electrical NSN 5180-00-323-4915
Personnel Required:
MOS 67
REMOVAL - SWITCHES AND LIGHTS
1. Open both instrument panel rear doors. Lift up the overhead instrument panel cover and secure props.
2. Remove cover behind left side of instrument panel.
3. Disconnect wiring from two switches, three pushbuttons, four lights, hourmeter and transformer.
4. Remove the two switches, three pushbuttons, four lights, hourmeter and transformer.
GO TO NEXT PAGE
3-74
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |