|
|
TM 55-4920-442-13 & P
3-64. Pumps-Replace (cont.)
3-64
INSTALLATION - MAIN PUMP
1. Lift pump into place through bottom of test stand using sling of overhead lifting device.
2. Attach main pump to motor with twelve mounting bolts and washers.
3. Connect volume and compensator controls to the pump.
4. Connect all tubing and lines to and from the pump.
INSTALLATION - FILL PUMP
1. Connect fill pump to motor with mounting bolts.
2. Connect two lines to fill pump.
END OF TASK
3-90
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |