Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 55-4920-442-13 & P
3-67. Cooler - Replace (cont.)
3-67
INSTALLATION
1. Place cooler assembly in test stand and secure with four bolts, washers and nuts.
2. Connect manifold piping to low pressure filter and other lines and tubing to fan side of cooler assembly.
3. Connect electrical wiring and conduit to motor connection box.
4. Install fill pressure filter switch and low pressure filter switch located on left side of cooler fan shroud cover.
5. Install temperature gage line across top and down side of cooler shroud cover.
END OF TASK
3-95

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business