|
|
TM 55-4920-442-13 & P
3-74. Fluid reservoir - Inspect
3-74
This task covers:
Inspection
INITIAL SETUP
Personnel Required:
MOS 67
INSPECTION
1. Check fluid level to make sure it is 3/4 to 7/8 full.
2. Check all tubing and line connections for leaks.
3. Check sending unit wire for loose connection or corrosion.
4. Check reservoir tank for mechanical damage.
END OF TASK
3-113
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |