Quantcast Operating Instructions

 

Click here to make tpub.com your Home Page

Page Title: Operating Instructions
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
Figure 5. Shipping Dimensions
Up
TM-55-4920-341-14 Test Stand Hydraulic System Gasoline Engine Driven Model D - 5B Manual
Next
Servicing New Equipment.
SECTION I (Con't.)
Operating Instructions
1-7 Unloading and Unpacking Equipment
(A) Unloading.
(1) Disconnect tie-down straps.
(2) Where a lifting device of suitable capacity (over
3000 lb.) is available, connect cable slings to
lifting eyebolts and lift the test stand from the
carrier.
(3) When a lifting device is not available, build a
ramp with suitable lumber and tow the test stand
off the carrier.
(B) Unpacking.
(1) Remove pressure sensitive tape from seams, doors,
panels, screen, and ventilation ducts.
(2) Remove barrier material from ventilation ducts and
screens.
(3) Remove bags of desiccant from inside test stand
housing.
(4) Remove pressure sensitive tape from all sealed
openings.
(5) Use solvent Specification PP-S-661 for removal of
preservatives from exterior surfaces of the equip-
ment.
1-8 Inspection of New Equipment
(A) Perform the before-operation services decribed in

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc.
6230 Stone Rd, Unit Q Port Richey, FL 34668

Phone For Parts Inquiries: (727) 493-0744
Google +