TM 5-2350-378-23&P
FIELD MAINTENANCE
SERVICE UPON RECEIPT
INITIAL SETUP:
Personnel Required
References (cont.)
Construction Equipment Repairer, 91L
DA PAM 750-8
SF 361, Transportation Discrepancy Report
References
SERVICE UPON RECEIPT OF MATERIEL
Inspect the equipment for damage incurred during shipment. If the equipment has been damaged, report the damage
on the SF 361, Transportation Discrepancy Report.
Check the equipment against the packing slip to see if the shipment is complete. Report all discrepancies in
accordance with applicable service instructions (e.g., for Army instructions, see DA PAM 750-8).
Check to see whether the equipment has been modified.
Refer to INTRODUCTION TO USING THE HYDRAULIC DIAGNOSTIC CENTER (HDC) SYSTEM TO
TROUBLESHOOT THE M9 ACE HYDRAULIC SYSTEM (WP 0004) for the required equipment and tools.
INSTALLATION INSTRUCTIONS
Refer to INTRODUCTION TO USING THE HYDRAULIC DIAGNOSTIC CENTER (HDC) SYSTEM TO
TROUBLESHOOT THE M9 ACE HYDRAULIC SYSTEM (WP 0004) for installation instructions.
END OF TASK
END OF WORK PACKAGE
0024-1/2 blank
03/15/2011Rel(1.8)root(surwp)wpno(M00001)