TM 5-2350-378-23&P
0023
Table 1.
Preventive Maintenance Checks and Services (PMCS) - Continued.
ITEM TO BE
EQUIPMENT
ITEM
CHECKED OR
NOT READY/
NO.
INTERVAL
SERVICED
PROCEDURE
AVAILABLE IF:
5
Weekly
Primary
Ensure that the seven hydraulic metal tubes connected Any condition would
Manifold/
between primary manifold and DCV bank are tight and prevent safe operation of
Directional
that there are no leaking fittings.
vehicle.
Control Valve
(DCV) Bank
(Figure 5)
DCV
BANK
PRIMARY
MANIFOLD
I0005HDC
Figure 5.
Hydraulic Metal Tubes.
6
Weekly
HDC System
Check that all HDC system pressure transducers are
Any condition would
Pressure
tightly seated in adapters.
prevent safe operation of
Transducers
vehicle.
7
Weekly
Perform M9 ACE HDC system Functional Check-Out
Any condition would
prevent safe operation of
pro (WP 0025) . If the HDC system does not pass all
vehicle.
portions of the Functional Check-out procedure, refer
to (WP 0021) and proceed to troubleshoot as applicable.
PMCS MANDATORY REPLACEMENT PARTS
There are no mandatory replacement parts for these PMCS procedures.
END OF TASK
END OF WORK PACKAGE
03/15/2011Rel(1.8)root(pmcswp)wpno(I00002)