TM 5-2350-378-23&P
0035
ASSEMBLY
CAUTION
Assembly should be performed in a clean environment and protective dust covers or caps
should be installed on all openings to prevent contamination. Dirt can damage parts and
cause malfunctions.
When securing primary manifold in vise, exercise extreme care not to mar any surfaces
or damage components.
1.
Install three new O-rings (Figure 3, Item 2), three new packing retainers (Figure 3, Item 3), three new O-rings
(Figure 3, Item 4), three new packing retainers (Figure 3, Item 3), and three (NO) valves (Figure 3, Item 1) on
primary manifold (Figure 3, Item 14).
2.
Install two new O-rings (Figure 3, Item 2), two new packing retainers (Figure 3, Item 3), two new O-rings
(Figure 3, Item 4), two new packing retainers (Figure 3, Item 3), and two (NC) valves (Figure 3, Item 5).
3.
Install six new O-rings (Figure 3, Item 7), six new packing retainers (Figure 3, Item 8), six new O-rings
(Figure 3, Item 9), six new packing retainers (Figure 3, Item 8), six new packing retainers (Figure 3, Item 10),
six new O-rings (Figure 3, Item 11), six new packing retainers (Figure 3, Item 10), and six three-way valves
(Figure 3, Item 6) on primary manifold (Figure 3, Item 14).
4.
Install relief valve (Figure 3, Item 15), three O-rings (Figure 3, Item 13), and three transducers
(Figure 3, Item 12) on primary manifold (Figure 3, Item 14).
0035-6
03/15/2011Rel(1.8)root(maintwp)wpno(M00012)