Table 1. Preventive Maintenance Checks and Services Operator's daily schedule
Figure 15. Handle assembly, exploded view.

Maintenance Manual For Crimping Outfit, Hydraulic, Voicemitter-Outlet Valve Assembly, Abc-M1
Page Navigation
  11    12    13    14    15  16  17    18    19    20    21  
img
. . . . . . . . . . .
TM 3-5180-210-15
CHAPTER 4
ORGANIZATIONAL MAINTENANCE INSTRUCTIONS
Section I. SERVICE UPON RECEIPT OF MATERIEL
27. General
(2) Using the capscrews (7) as a guide, aline
the handle bracket (5) with the spacer block (4) and the
a. Organizational  maintenance  personnel  are
two threaded holes near the top of the right vertical
authorized to unpack, assemble, and install the ABC-M1
support plate (9).
crimping outfit (para 28 and 29).
(3) Tighten the capscrews as tight as possible
b. Perform before-operation services (para 22)
using a 3/8-inch socket-head screw key.
before putting any equipment into service.
(4) Pull the handle (6) forward until the edge
28. Unpacking
of the cam (8) engages the die.
a. Open  the  box  and  remove  intermediate
packages.
(5) Remove and discard the bolt (3), nut (1),
and washer (2) that hold the two spring-loaded sections
b. Remove the four bolts anchoring the hydraulic
of the lower die (10) together.
press to the base of the box.
b. Pressure Gage.
c. Use a hoist to remove the press from the box
(1) Remove the pipe plug (7, fig. 16) from
and to position it on the workbench.
the opening marked "G" in the top of the
d. Remove block and tie down from the release (2,
cylinder head.
fig. 1). Rotate the lever 180 degrees clockwise to move
(2) Apply a thin coating of gasket-forming
the knob to the front of the press.
compound to the threads on the bottom of
e. Pull down on the release lever with one hand.
the pipe nipple (8) that is attached to the
With the other hand, raise the upper die (8) of the
pressure gage (1).
crimping die set.
(1) Screw the nipple handtight into the
f. Remove the shipping block from the lower die.
opening marked "F".
g. Unpack the contents of intermediate packages.
(4) Grasp the flat surfaces on the stem of the
h. Using solvent, remove the trust-preventive
pressure gage with a wrench, and turn the
coating from the various parts.
gage one full turn plus that part of a
29. Assembly and Installation
second turn that is required to make the
Note.
dial face front.
Do not remove the bolt (3, fig. 15),
c. Hinged Top Oiler.
nut (1), and washer (2) that hold the
(1) Remove the pipe plug (3, fig. 16) from
two spring-loaded parts of the lower
the opening marked "F".
die (10) together until after the
(2) Screw the hinged top oiler (4) finger-tight
handle assembly has been installed.
into the opening.
a. Handle Assembly (fig. 15).
d. Pump Handle. Insert the pump handle (4, fig.
(1) Remove and discard the two nuts that
1) through the hole in the rocker shaft as shown in figure
hold the handle assembly together.
1.  Tighten the handle in position with the setscrew
located in the end of
19