TM 5-2350-378-23&P
0012
FRONT CORNER (LEFT OR RIGHT) RAISES IN SPRUNG, BUT NOT UNSPRUNG MODE - Continued
WARNING
Do not operate ejector when personnel are in bowl. Do not work in bowl unless ejector
lock is engaged. Failure to comply may result in severe injury or death to personnel.
NOTE
All control rods are adjusted same way. This procedure covers SPRUNG/UNSPRUNG
control rod.
a.
Note position of control valve plunger (Figure 3, Item 1) when SPRUNG/UNSPRUNG control lever is in
NEUTRAL (off) position.
NOTE
Normal control valve plunger travel is 9/32 in. (7 mm).
b.
Remove cotter pin (Figure 3, Item 2), straight pin (Figure 3, Item 5), and clevis (Figure 3, Item 6) from
control valve plunger (Figure 3, Item 1). Discard cotter pin (Figure 3, Item 2).
c.
Loosen jam nut (Figure 3, Item 7). Turn clevis (Figure 3, Item 6) clockwise to shorten rod
(Figure 3, Item 3); counterclockwise to lengthen rod (Figure 3, Item 3).
d.
Hold measuring device (Figure 3, Item 4) on face of SPRUNG/UNSPRUNG control valve.
e.
Have assistant move SPRUNG/UNSPRUNG lever between SPRUNG and UNSPRUNG mode.
f.
Measure distance of plunger travel.
g.
Adjust length of rod (Figure 3, Item 3) travel to desired distance by turning clevis (Figure 3, Item 6) as
necessary.
h.
Coat threads of rod (Figure 3, Item 3) with sealing compound.
i.
Tighten jam nut (Figure 3, Item 7) against clevis (Figure 3, Item 6).
j.
Connect clevis (Figure 3, Item 6) to control valve plunger (Figure 3, Item 1) with straight pin
(Figure 3, Item 5) and new cotter pin (Figure 3, Item 2).
3
2
1
7
4
6
5
T00106HDC
Figure 3. SPRUNG/UNSPRUNG Control Valve Linkage.