  189    190    191    192    193  194  195    196    197    198    199  
img
.
TM 5-2350-378-23&P
0015
HYDRAULIC OIL OVERHEATS - Continued
STEP
27.
Remove all test equipment.
a.
Tighten nut (Figure 35, Item 6) on charge valve (Figure 35, Item 5).
b.
Close nitrogen tank valve (Figure 35, Item 1).
c.
Back off regulator valve (Figure 35, Item 2), open bleed valve (Figure 35, Item 8), and bleed hose pressure
to 0 psi.
d.
Remove adapter valve (Figure 35, Item 4) from charge valve (Figure 35, Item 5).
e.
Remove pressure measuring device (Figure 35, Item 3) from bleed valve (Figure 35, Item 8) on charging
harness (Figure 35, Item 10).
f.
Install charge valve cap (Figure 35, Item 7) on charge valve (Figure 35, Item 5).
g.
Install valve guard (Figure 35, Item 9).
3
1
2
4
8
5
6
7
10
9
T01350HDC
Figure 35. Main Hydraulic Accumulator.
CONDITION/INDICATION
Is all test equipment removed?
DECISION
YES - Go to Step (29).
NO - Repeat Step (27).
0015-40