TM 5-2350-378-23&P
0026
INSTALLATION
1.
Install stowage bracket (Figure 2, Item 4) with two washers (Figure 2, Item 3) and two threaded rods
(Figure 2, Item 1) onto compartment bulkhead.
2.
Tighten two jam nuts (Figure 2, Item 2) against bulkhead to secure two threaded rods (Figure 2, Item 1).
2
3
1
4
3
2
1
M0002HDC
Figure 2.
Hydraulic Diagnostic Center (HDC) Stowage Bracket Installation.
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Install Hydraulic Diagnostic Center (HDC) distribution box (WP 0004).
2.
Return operator's seat to ready position (TM 5-2350-262-10).
END OF TASK
END OF WORK PACKAGE
03/15/2011Rel(1.8)root(maintwp)wpno(M00002)